Find out about our latest projects. A brief selection of some of the many data centre technology solutions and services projects recently undertaken by our highly qualified technical experts. We support corporate clients in the UK and Europe, providing bespoke infrastructure solutions and services using the best in leading-edge technology, across a wide variety of solutions.

Below is a small selection of our recent activities.

Stay informed – with infrastructure experts Richardson Eyres

 

Project Managed Infrastructure Move

Project for an independent provider of actuarial, administration and consultancy services.

Richardson Eyres were asked to assist the company with the move of a storage system and related equipment from one office to a new rack in a separate office. Richardson Eyres were required to manage the move of all designated hardware, ensuring that the HPE 3PAR storage system was correctly decommissioned and recommissioned, and that the UPS and LAN switches were racked as required. For transportation Richardson Eyres used company vans fitted with hydraulic tail lifts. As well as transporting the hardware, Richardson Eyres oversaw the installation of two new Brocade SAN switches as part of the project to provide connectivity to the newly relocated 3PAR.

Posted in | Tagged , , , , , , | Leave a comment

Re-provisioning of existing Storage

Project for an international law firm.

Richardson Eyres were asked to assist the company with the return to service of an EMC VNXe3150 storage array that was recently relocated from Hong Kong to the Washington DC data centre.
The project focused on the reconfiguration on the iSCSI and management IP addresses and NAS shares of the VNXe 3150. Richardson Eyres also liaised with the company to define any new iSCSI hosts that may be required.

Posted in | Tagged , , , , , , | Leave a comment

Production Storage Refresh and Disaster Recovery

Project for an international law firm.

The purpose of this project was to purchase new storage hardware for primary production (EMC VNX + switches) and create new optimised storage pools: Production (mainly ESX), File and RecoverPoint. As well as this, Richardson Eyres upgraded existing core systems to be in-step with new production and installed RecoverPoint to provide replication – failover/failback.

Posted in | Tagged , , , , | Leave a comment

EMC Avamar Installation

A project for a science-led global healthcare company

Richardson Eyres undertook the installation of EMC Avamar in remote office locations away from main data centres in the EMEA region. For each site we were required to rackmount and configure 1 x Avamar Business Edition Node for deployment. The nodes were all shipped to the individual sites and needed to be connected to the new Cisco network switches to allow the configuration to take place. A WebEx session was initiated for each installation and the configuration of the nodes was checked and any final configuration changes were made remotely.

Posted in | Tagged , , , , | Leave a comment

Creating a virtual environment with backup capability

A project for an IT services company.

Richardson Eyres were asked to supply, build and install two HPE DL 380 G9 servers with preconfigured VMware vSphere with Essentials Plus licensing. The installation and configuration included provisioning of a VMware vCentre server appliance and three virtual Windows 2012 R2 servers.

Active Directory and file services were migrated to one of the newly configured Windows 2012 R2 servers from two existing physical servers. Richardson Eyres were responsible for migrating customer data over from the existing file server and decommissioning the existing physical domain controller and file server.

In addition, a Synology NAS was configured and installed on the customer network and file data transferred from an existing NAS device. Richardson Eyres also installed and configured Arcserve UDP backup software on one of the unused and newly configured Windows 2012 R2 virtual machines. The Arcserve backup software was configured to store all of its backup data on a file share on the newly installed Synology NAS device. Symantec Anti-Virus Manager was also installed onto the new Active Directory virtual server.

Posted in | Tagged , , , , , , , | Leave a comment

Backup as a Service and ReliableDR for a large aggregate supplier.

The business has multiple sites across the UK, all connecting to their head office for access to their IT systems. There was just one WAN connection in and out of the head office site, with only one connection into their building leaving the business with a single point of failure which the entire business depends on. In review of their IT infrastructure, the company needed to know that in the event of a data corruption or loss, system failure or total site disaster, that their recovery process is reliable and fast

The business had concluded that it would be prohibitively expensive to introduce network resilience into the site and the site itself is an industrial facility which, by its nature, is a high-risk environment.

Without a Disaster Recovery solution or service in place, should an incident effect the site, or the IT operations within it, the business was at serious risk of an extended outage which would have a major impact on business productivity, client project delivery, reputation, revenue and probable loss of customers. With little systems resilience onsite, a single server failure would result in a period of downtime for the application concerned before service could be restored.

RE Cloud are now running Backup as a Service and Reliable DR for the company, this ensures up-to-date copies of data both on and offsite and an automated and verifiable approach to Disaster Recovery with orchestrated failover to our UK Recovery Centre.

Posted in | Tagged , , , , , | Leave a comment

Backup as a Service for a Safety Equipment Supplier

Backup as a Service for a company specialising in the design and installation of fire sprinkler systems.

The company was originally backing up to drives locally and did not have an offsite backup set up when they suffered a ‘ransom’ software attack. This software attack began to encrypt their data but fortunately they managed to restore their data from one of the drives that hadn’t failed. The shock of this attack brought into light the value of the company’s business data and the essential nature of data protection. RE Cloud are now running Backup as a Service for the company to ensure their data can be restored at all times. RE Cloud Backup as a Service (BaaS) is a replacement for on-premise backup and offsite data protection, offering the benefits of the most advanced enterprise backup solutions with ground-breaking and cost-effective recovery, in a simple pay-as-you-go arrangement.

Posted in | Tagged , , , , , , | Leave a comment

3PAR 8200 Implementation

A project for a newspaper and magazine publishing company.

The aim of this project was to install and configure an additional HPE 3PAR 8200 array to the customer’s Data Centre.
The new 3PAR 8200 replicated the already existing 7200’s on site and connected to their SAN fabric via Brocade switches.

Posted in | Leave a comment

Virtual Desktop Infrastructure for a Property Consultancy Company

A project for a leading multi-disciplined construction and property consultancy.

The company required a VMware Enterprise License Agreement for their VDI environment for the next five years. Richardson Eyres provided the license agreement and helped the company with a financing deal in order to help manage payments to fit their business cycle.

Posted in | Leave a comment

Managed Service for a Survey Company

A managed service for a specialist geological survey company.

The purpose of this service is to manage the company’s IT Infrastructure located at two sites and to form a strategic method for improving the company’s operations whilst cutting expenses.

Richardson Eyres are now responsible for managing the following elements of the customer’s infrastructure: Compute (servers), Storage (Storage Arrays and SAN Switches) and Hypervisor (VMware vSphere).

As a part of the service Richardson Eyres provide platform system administration as well as reactive support (incident management). This includes customer advisory, vendor escalation and case ownership. All systems are proactively monitored during the business hours and alerting system configuration enables us to provide Emergency Cover (reactive support to business critical issues out of business hours 24/7). Firmware updates and patches are implemented during scheduled working windows in line with agreed change control process. Additionally, yearly system Health Checks and Capacity reports are provided giving full analysis and best practice recommendations on how to fully optimize the platform.

Posted in | Leave a comment

Data Centre Relocation

A project for one of the UK’s largest port groups.

The purpose of this project was to relocate several items of IT infrastructure from one data centre to another. Richardson Eyres assisted with the move of two HPE 3PAR storage and associated systems, and ensured that the systems in scope of the move were fully operational upon power up. All audited items were successfully migrated.

Posted in | Leave a comment

Hewlett Packard Enterprise 3PAR deployment and configuration including Data Migration

A project for a pan-European investment bank.

The company’s legacy iSCSI SAN infrastructure was replaced with the latest 3PAR storage from Hewlett Packard Enterprise – in combination with the deployment of new blade servers using  Flex-Fabric technology.

The data migration followed the deployment / configuration of the new Virtual Machine hosts and SAN Storage. The host data was migrated to the new volumes on the HPE 3PAR Disk Arrays using the most appropriate method for each server, with downtime kept to a minimum. Migration planning was undertaken and confirmed with the customer project team during a workshop. Initially a small number of low risk migrations were performed and, upon success the customer migrated all remaining Virtual Machines over a period of weeks. Once all VMs had been migrated from the old cluster there was the opportunity to facilitate the migration of API VMs. Cooperation with customer’s systems admin team while supporting their business critical IT infrastructure are key for the Richardson Eyres data migration team. We have led the engagement in terms of planning, guidance, defining processes, documentation and migration methodologies throughout.

Posted in | Leave a comment

About Us

About Us

About Us

Case Studies

Case Studies

Case Studies

News & Events

News & Events

News & Events

Our Latest Projects

Our Latest Projects

Our Latest Projects

Whitepapers and Datasheets

Whitepapers and Datasheets

Whitepapers and Datasheets

Supporting Helen & Douglas House

Supporting Helen & Douglas House

Supporting Helen & Douglas House

Video Wall

Video Wall

Video Wall

Our Blog

Our Blog

Our Blog

Work with Us

Work with Us

Work with Us

Contact Us

Contact Us

Contact Us

Arrow
Arrow
ArrowArrow
About Us
Case Studies
News & Events
Our Latest Projects
Whitepapers and Datasheets
Supporting Helen & Douglas House
Video Wall
Our Blog
Work with Us
Contact Us
Slider

Comments are closed